
Switching from hourly to performance pay: a plumbing and HVAC company backtested 10% sold plus 10% completed and beat base pay in 2 of 4 weeks.
Switching from hourly to performance pay is one of those decisions owners talk about for a year before they touch it. The math is not the hard part. The hard part is the week a good technician opens his paycheck, sees a number he does not understand, and decides the new plan is a pay cut.
The owner of a plumbing and HVAC company on the East Coast put it more bluntly on a recent call with our team. He liked what he was seeing in the performance model. Then he looked at the weeks where his plumber would have come in under base pay and asked the real question: "How do I not piss an employee off? How do I get these guys to buy into that?"
His answer, so far, has been to slow down. Before anyone on the team hears a word about a new plan, the company is running two pay models side by side on real jobs and real hours. This post walks through what that test showed across four weeks for one plumbing technician, why overtime turned out to be the swing factor, and the rollout the owner is planning. Nothing here is a payroll result yet. The plan is not live, and the owner has said it will not be for at least two more months. That is the point of the story.
Two Pay Models, Tested Side by Side
The company runs plumbing and HVAC, residential and commercial, with separate technicians for each trade, an install team, comfort advisors, a customer service rep, a dispatcher, and a service manager. Jobs live in ServiceTitan. Hours come from payroll and are sent over once a week after they are finalized.
The owner asked to compare two ways of paying his service technicians.
Model one: performance pay, weekly. A technician earns 10% of the revenue he sells and 10% of the revenue he completes. Each week that total is compared with his base pay, which is his regular and overtime hours at his hourly rate. He is paid whichever is higher. Because 10% goes to whoever sold the job and 10% goes to whoever did the work, the company never pays more than 20% of a job in technician labor. That lands at the top of the 16% to 20% labor range our team typically sees for service work.
Model two: hourly plus incentive, monthly. The technician keeps his hourly pay and overtime. On top of that he earns a bonus from monthly revenue tiers, plus fixed-dollar spiffs for specific items he sells. In September, the plumber in this test finished above $65,000 in revenue, which put him into a higher tier.
Both are legitimate designs. The second one feels safer to a team because the paycheck never changes shape. The first one has no ceiling. If you want a wider view of how the pieces fit together, our guide to HVAC commission pay covers the common structures and where each one breaks.
The owner's instinct was to stop debating and look at data. "Any and all data's good," he said, "if you know how to use it."
What Four Weeks of Real Jobs Showed

Our team reran four recent weeks for one plumbing technician using the hours the company's payroll admin had sent over. Here is what came back.
- The first week on screen: he sold $6,462 and completed $9,559. At 10% each, that is $646 plus $955, or $1,601 by our arithmetic before any scorecard items. His base pay that week, with overtime, was about $2,100. Performance pay came in under, so he would have been paid his base.
- The week of October 16: base pay was $1,979. Performance pay beat it.
- The week of October 9: performance pay beat base again, this time by about $170.
- The week before that: he was slightly under, at about $2,072 of performance pay against about $2,337 of base. Again, a heavy overtime week.
Two weeks ahead, two weeks behind. Our team summed it up on the call: about half the time he beats it, and about half the time he is under.
A test like this tells you three things at once. It tells you whether the rate is in the right neighborhood (it is: a technician who clears base half the time on a brand-new plan is not being set up to fail). It tells you who the plan favors. And it tells you what is driving the misses. In this case the misses had almost nothing to do with how much he sold.
If you are running the same kind of test, the method another company used in this technician commission calculator backtest is worth borrowing. They adjusted a rate based on what three weeks of real jobs showed, before anyone saw a paycheck.
Why Overtime Decides Which Plan Wins
Look at the two losing weeks again. In both, the technician worked a lot of overtime. Overtime raises base pay quickly, because those hours are paid at a premium. Performance pay does not move with hours at all. It moves with revenue. So a long week of low-ticket work pushes base pay up while performance pay stays flat, and the comparison tips toward base.
The owner saw the tradeoff right away. "The overtime is killing the guys," he said, "but then that's gonna keep my labor rate down too, though."
He is right on both counts. Under an hourly model, overtime is the technician's raise and the company's cost overrun. Under performance pay, the company's labor cost on a job is capped at 20% no matter how many hours it took, and the technician's raise comes from selling and finishing more work in the same week. That is what makes the model predictable for an owner. It is also what makes it uncomfortable for a technician who has learned that long weeks are how you get ahead.
Two practical notes came out of this part of the call.
First, the comparison only works if base pay includes overtime. The owner noticed the overtime calculation was not switched on in the plan settings and turned it on during the call. Without it, performance pay would have looked better than it really was in every heavy week, and the first live paycheck would have exposed the gap.
Second, the "whichever is higher" rule is what makes the transition survivable. No technician takes home less than his hours would have paid. For more on how that rule works alongside overtime, see overtime pay for commissioned employees.
Switching From Hourly to Performance Pay Without Losing the Team
This is where the owner spent the most time, and where most rollouts go wrong. He does not have a math problem. He has a trust problem that has not happened yet, and he wants to keep it that way. "I wanna do this. I wanna do it right," he said. A week later, on a follow-up call: "I wanna make sure I got this dialed in."
Here is the plan as it stands.
- Track first, announce later. Both plans are running in the background on live data. Technicians cannot see them. The owner reviews the weekly comparison and gets a feel for how each person would do across slow weeks, vacation weeks, and big weeks. The plumber in this test is away for three weeks this month, which is exactly the kind of stretch a new plan needs to be checked against.
- Launch with one technician. Our team's advice was to start with a single key employee whose opinion the others respect, possibly in December or January. If he is engaged and earning more, the rest of the team hears about it from him and not from a slide. The owner is weighing which technician that should be. One of them, he noted, would have done better on performance pay than on the hourly-plus plan.
- Explain the floor before the upside. The first sentence of the pitch is that nobody earns less than their hours. The second is that there is no ceiling. A technician controls his pay by selling more and by finishing jobs more efficiently, and he can see the running total on his phone.
- Let someone else give the pitch. Our team offered to meet with the technicians, walk through the plan, and put it in employee terms. Owners often underestimate how differently the same plan lands when it is not coming from the person who signs the checks.
- Set a date you can move. The owner floated February 1 for go-live, then said plainly on the next call that he is not going live for at least another two months. "I don't feel that we have to rush to get this out," he said.
That patience is the lesson. A technician commission vs hourly pay decision does not need to be made in one meeting. It can be made after eight or ten weeks of watching both numbers, when you already know which technicians will come out ahead and what you will say to the ones who will not.
One Rate Does Not Fit Every Role

Once the owner was comfortable with the service technician test, the conversation widened. Performance pay, he said, "is the ultimate goal out of all of this." But the 10% and 10% that work for a service plumber would wreck the margin on an install.
The install plan came together in a few minutes of back and forth. Our team first proposed 6% for selling and 6% for completing. The owner pointed out that his installers do not sell. Comfort advisors do, and they already earn between 4% and 8% depending on the margin and the discount on the job. So the sold-by piece came out, and installers are set at 6% of completed install revenue. That keeps install labor near a 12% target, against roughly 20% for service. Install labor typically runs 10% to 14% of revenue, so 12% sits in the middle of the range.
The rest of the company is getting plans built around what each role controls:
- Customer service rep: booking rate, calls booked, outbound calls, and memberships sold, plus 1.5% of the revenue from open estimates she follows up on and closes. That last piece needed a new job field in ServiceTitan so the system knows who did the follow-up. It was created live on the call.
- Service manager: a fixed award pool tied to three or four company numbers, including revenue, callback rate, gross margin, and labor rate.
- HVAC technicians: a separate scorecard from the plumbers, because the owner realized mid-call that the two trades are measured on different things. It tracks conversion rate, average ticket, leads generated, memberships, and five-star reviews. For now those are targets with no award attached. "These are just our targets," the owner said. "There's not necessarily a reward to this."
- Dispatcher: still being drafted.
Spiffs are being cleaned up as well. The owner wants every spiff tracked as its own line, so a technician can see which item earned him what. If you are sorting out a similar list, the ShareWillow plan builder is where each of those lines gets mapped to a real job record.
What to Take From This
The honest summary is that this company does not have a result yet. It has something more useful at this stage: four weeks of evidence that the proposed rate is fair, a clear explanation for the weeks it loses, and a rollout plan that does not depend on anyone taking the owner's word for it.
A few points worth carrying into your own switch:
- Run both plans on the same weeks before you choose. A plan that looks generous on paper can lose to base pay in every overtime week.
- Include overtime in base pay when you compare. Otherwise the test flatters the new plan.
- Cap the total. Paying 10% to the seller and 10% to the technician who completes the job means labor never exceeds 20% of the ticket.
- Set install rates separately. Six percent on completed install revenue is a very different number from 10% on a service call, and it should be.
- Pick your first technician carefully and give yourself room on the date.
"Now that we're getting information in here," the owner said near the end of the first call, "I'm liking this."
More real examples
The same question comes up with other companies. Here is how a few of them answered it, with their numbers.
How a Home Services Company Caught an 8.75-Hour Pay Gap Before the First Payout
Hourly plus commission for technicians only works if the math checks out. One home services company caught an 8.75-hour pay gap before its first payout.
It is also easy to get subtly wrong. Two numbers have to line up every pay period: the hours payroll already trusts and the commission the plan calculates. If either one drifts, a technician is overpaid or shorted, and nobody notices until a paycheck looks off.
A home services company running technician and CSR plans hit exactly that during setup. Before a single plan went live, the payroll administrator compared the plan's numbers against the payroll records and found four mismatches. This article walks through what they were, how each one got resolved, and the checks any company should run before paying commission on top of hourly wages.
How One Home Services Company's Techs Earned Up to 55% More on Commission Than Hourly
Technician pay plans compared: a home services company piloted commission against hourly pay for one week, and techs earned up to 55% more take-home pay.
One home services company decided to actually test that assumption instead of debating it. Rather than switching every technician to commission overnight, the owner ran a side-by-side pilot: a two-person install crew, a lead technician and a helper, would be paid what they would have earned under the existing hourly wage, and separately what they would have earned under a proposed commission plan, for the same week of real jobs. Then they would compare the two paychecks line by line.
The pain point was simple to describe and hard to solve: technicians were paid hourly no matter what they actually produced. A crew that knocked out a large, high-ticket job on a Saturday earned the same rate as a crew that spent the week on smaller, lower-margin work. There was no mechanism to reward the technician who took the tougher jobs, worked the weekend slot, or ran solo when a helper called out. Over time, that flatness becomes its own kind of unfairness. The company's best performers had no financial reason to keep being the best performers.
Frequently Asked Questions
How do you switch technicians from hourly to performance pay?
Start by running the new plan in the background for several weeks on real jobs and real hours. Compare it with base pay each week, find out what causes the misses, and adjust the rate if needed. Then launch with one respected technician before rolling it out to everyone, and keep a rule that pays the higher of base pay or performance pay.
What percentage should a service technician earn on performance pay?
This company is testing 10% of sold revenue plus 10% of completed revenue, which caps technician labor at 20% of a job. Service labor commonly runs 16% to 20% of revenue, so the combined rate sits at the top of that range. Installers are set lower, at 6% of completed install revenue.
Will technicians lose money in slow weeks?
Not if the plan pays the greater of base pay or performance pay. In this test the technician fell short of base in two of four weeks, both with heavy overtime, and in those weeks he would have been paid his regular and overtime hours as usual.
Related reading
- Technician Commission vs Hourly Pay: How an HVAC Company Protected Base Pay While Launching a 5% Service and 3% Install Plan
- Technician Commission Calculator: How a Plumbing Company Tested an 18% Plan Against $43,845 in Real Payouts
- Overtime Pay for Commissioned Employees: How One Installer Company Pays the Greater of Base or Performance Pay
- HVAC Commission Pay: How to Design a Plan That Drives Profit (Not Problems)
- Performance-Based Pay: Definition, Benefits, Challenges & Tips
Conclusion
Run both plans on the same weeks, count overtime in base pay, cap labor at 20% of the job, and launch with one technician first.
See what performance pay would pay your techs.
On a free call, we'll show you what your techs would earn for the great work they already do.
Book a free call
Ryan Shank is the founder of ShareWillow. Before ShareWillow, he spent 15 years building software for the trades and founded PhoneWagon, which CallRail acquired.


